July 5, 2021 – Back at it, Getting ready for pilot house glass

Back to work. I moved the pilot house into the garage and prepped it for some glass. Starting with the bottom of the pilot house foam risers. Spent many hours templating and cutting out the 1708 cloth. 3 layers of 1708 are going down. It is a challenging process because of the many corners, changes in height, length of the run, and the fact that you do not want the breaks and butt joints from one layer to the next to occur at the same location. After much trial & tribulation and planning, I finally had a plan. I cut the templates out. Then I cut the 1708 cloth.

Templates made.

1708 cloth cut and test fit.

Another test fit.

All of the 1708 cloth cut, organized, and ready to lay down.