8 Jun 2021 June 7 Had to do a little work on a couple of ‘imperfections’ in the keyhole layup. The temp was a bit warm when I laid it up – but I went for it anyways. Paid the price. Bottom left was an air bubble and just above that was a dry portion of the layup.